SLM Watford
On this project we constructed swimming pools to existing leisure centre extension and complete external works which included construction of new subbase storage to new car park.
Swimming pool construction. External works included formation of new subbase storage which required moving over 1100m3 of ground from site and preparation of all hardstanding areas for surfacing contractor. Swimming pool structure was fully watertight and we had to adhere to all SIKA pouring requirements.
Contract Value
£ 650 k
Principal Contractor
Vincent Stokes
Concrete Poured
250 m3
Project Norwood Swindon
Project Norwood Swindon
On this project TCL was responsible for Construction of 3nr lift cores to 8 story new build in the heart of Swindon for Zurich. Installation of concrete topping to metal decking floor plates on 8 levels.
A high risk project including 3 closely situated lift cores and stair shaft. Adapt formwork provided formwork and jump systems for this project which had an extremely tight programme. Upon request by TCL Ischebeck Titan were called to construct the 3rd smaller core. 1nr tower crown provided lifts for 2nr main cores which progressed simultaneously. 34nr cast in steel...
CSH Blackburn
CSH Blackburn
Another great job for a fairly new client for us at TCL. Package included the formation of external concrete yard slabs with a brush finishLocated in Blackburn, we undertook the works on a very tight programme needed by the client. 10,000 square metres was split into two visits over 6 weeks.
On the first visit we poured 5,000 m2 of concrete in slightly over three weeks, much to our disappointment although there was little we could do about the inclement weather we experienced in this period.
However, the conditions were kinder to us on the second visit and we managed to complete...
Turbine Business Park Sunderland
Turbine Business Park Sunderland
PackageOn this project we were required to pour ground floor slabs and First floor slabs on Metal deck flooring to four units. We have managed to pour all slabs to 4 separate units totalling to 2500 m2 with power floor finish in just two pours
Contract Value
£120K
Principal Contractor
Stainforth Construction LLP
Concrete Poured
300 m3
Mc Donald’s Various locations
Mc Donald’s Various locations
We are involved in numerous McDonald’s projects across UK, for which we are mainly responsible for pouring Imprinted concrete drive throughs. Last year we successfully completed six McDonald’s sites in which we laid imprinted concrete
For future details about imprinted concrete works please refer details in our service’s tab.
Amazon Stockton
Amazon Stockton
On this project we were required to pour 42 000 m2 external concrete yard. Our works included laying mesh reinforcement, installing joints, supplying concrete pumps and pouring concrete. We have managed pours around 250 m3 per pour up to three times a week
Contract Value
£450k
Principal Contractor
ISG
Concrete Poured
8100 m3